Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Off Grid 500 Watt di Dusun Baku Desa Sumi Kecamatan Lambu

Penelitian

Authors

  • M. Ziaul Fikar Universitas Muhammadiyah
  • Sofyan Winardin Universitas Muhammadiyah

DOI:

https://doi.org/10.31004/jerkin.v4i1.1837

Keywords:

Off-Grid PLTS, Renewable Energy, Solar Panel, Remote Area, Sumi Village

Abstract

Electricity access in remote areas such as Dusun Baku, Desa Sumi, Kecamatan Lambu, remains a significant challenge due to the absence of PLN (state electricity company) grid infrastructure. This study aims to design a 500-watt Off-Grid Solar Power Plant (Photovoltaic/PLTS) system as a sustainable and environmentally friendly energy solution. The research uses an experimental approach, beginning with literature review, field data collection, and energy requirement analysis. The designed system consists of two 250 Wp solar panels, an MPPT-type solar charge controller, a 12V 200Ah VRLA battery, and a 1000W pure sine wave inverter. The system is capable of producing approximately 1.875 kWh per day, sufficient to meet basic household electricity needs such as lighting, fan, television, and mobile device charging. This Off-Grid PLTS provides a practical, cost-effective, and sustainable electricity solution for underserved areas while supporting Indonesia’s national renewable energy target.

References

Yuwono S, Diharto D, Pratama NW. Manfaat Pengadaan Panel Surya dengan Menggunakan Metode On Grid. Energi & Kelistrikan. 2021;13(2):161-171. doi:10.33322/energi.v13i2.1537

Manab A, H IT, Rabiula A, Matalata H. Perencanaan Pembangkit Listrik Tenaga Surya Sistem Off-Grid di Desa Bungku Kecamatan Bajubang Kabupaten Batanghari Jambi. J Electr Power Control Autom. 2022;5(2):61. doi:10.33087/jepca.v5i2.78

Fikar MZ, Kholid M, Widiharto A, et al. Analisis Energi Listrik Pada Bangunan Terintegrasi Photovoltaic Dengan Menggunakan Bim Electrical Energy Analysis In Building Integrated Photovoltaic Using Prosiding Seminar Nasional Teknik Elektro Volume 4 Tahun 2019. 2019;4:60-63.

Jurnal RT. Perencanaan Penggunaan Plts Di Stasiun Kereta Api Cirebon Jawa Barat. Energi & Kelistrikan. 2018;9(1):70-83. doi:10.33322/energi.v9i1.58

Naim M. Rancangan Sistem Kelistrikan Plts Off Grid 1000 Watt Di Desa Loeha Kecamatan Towuti. Vertex Elektro. 2020;12(01):17-25.

Dan N, Fisika T, Gadjah U. Simulasi sistem energi pada gedung departemen teknik nuklir dan teknik fisika universitas gadjah mada. Published online 2016:23-24.

Downloads

Published

19-07-2025

How to Cite

M. Ziaul Fikar, & Sofyan Winardin. (2025). Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Off Grid 500 Watt di Dusun Baku Desa Sumi Kecamatan Lambu: Penelitian. Jurnal Pengabdian Masyarakat Dan Riset Pendidikan, 4(1), 1837–1841. https://doi.org/10.31004/jerkin.v4i1.1837