Analisis Kelayakan Instalasi Listrik Bangunan Sekolah SMA Islam Sultan Agung 1 Semarang
Penelitian
DOI:
https://doi.org/10.31004/jerkin.v4i2.3778Keywords:
Electrical Installation, Lighting, PUIL 2011 StandardsAbstract
This study aims to assess the feasibility of the lighting and electrical system in Building A of SMA Islam Sultan Agung 1 Semarang. Electrical installations play an important role in supporting learning activities, especially since the building has been used for a long time. Therefore, an evaluation is needed to ensure compliance with PUIL 2011 and SNI 03-6197-2000 lighting standards. The method used is a case study with a qualitative approach, using primary data (voltage and current measurements with a clamp meter, and light intensity with a lux meter) and secondary data. The measurement results are compared with the standards to assess the suitability of the distribution system, cable size, and classroom illumination levels. The results show that the electrical system generally complies with PUIL 2011, but there are still shortcomings such as the use of phase cable colors and cable arrangement. In terms of lighting, some classrooms have an intensity below 250 lux, so it is necessary to add or rearrange lights. Regular repairs and maintenance are needed to keep the system safe, efficient, and comfortable to use.
References
Andrea, I., Haq, M. Z. and Siagian, S. M. (2020) ‘Analisa Sistem Instalasi Listrik Dan Pembagian Daya Di P . T Kereta Api Indonesia Persero ( Studi Kasus Stasiun Tebing Tinggi )’, 3(1).
Badan Standardisasi Nasional (2000) ‘SNI 03-6197-2000 Konservasi energi pada sistem pencahayaan’, Sni 03-6197-2000, p. 17.
Code, N. E. et al. (2001) ‘Tata cara perancangan sistem pencahayaan buatan pada bangunan gedung .’, pp. 1–32.
Dwilesmana, A. (2023) ‘ANALISIS SISTEM INSTALASI LISTRIK GEDUNG BERTINGKAT DI PT . MULTI GROUP HOLDING COMPANY’, 2(2), pp. 124–138.
Firdaus, H., Mulyana, D. and Suryadi, D. (2023) ‘Analisis Kelayakan Instalasi Listrik Rumah Tangga di Desa Baregebg Kecamatan Baregbeg Kabupaten Ciamis’, Jurnal Media Teknologi, 9(2), pp. 142–151. doi: 10.25157/jmt.v9i2.2933.
Imran, A. et al. (2022) ‘ELECTRICAL INSTALLATION STUDY PT . NUSANTARA PLANTATION XIV ( PERSERO ) TAKALAR SUGAR FACTORY’, 20(1).
Kasus, S. et al. (2017) ‘Evaluasi Desain Pencahayaan Interior Pada Ruang Pertemuan Publik Berdasarkan Nilai Intensitas Pencahayaan’, IX(2), pp. 73–77.
MAHENDRA, G. N. (2023) ‘Analisis Kelayakan Instalasi Listrik Kompleks Balai Desa Kelurahan Kali Wenang Kecamatan Tanggungharjo Kabupaten Grobogan’, pp. 12–13.
MORIS, A. (2024) ‘STUDI EVALUASI KELAYAKAN INSTALASI LISTRIK PADA GEDUNG WISMA PORA DI KABUPATEN PIDIE’, p. 6.
Sidiq, R. P., Priatna, E. and Usrah, I. (2023) ‘Analisis Kelayakan Instalasi Listrik di PT. Komatsu Indonesia (KBN Plant)’, Journal of Energy and Electrical Engineering, 5(1), pp. 3–7. doi: 10.37058/jeee.v5i1.7850.
SNI (2011) ‘Persyaratan Umum Instalasi Listrik 2011 (PUIL 2011)’, DirJen Ketenagalistrikan, 2011(PUIL), pp. 1–133.
Syarat, M. (2024) ‘ANALISA PEMBEBANAN DAYA INSTALASI LISTRIK’.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 M. Rayhan Fawwazimtiyaz, Sukarno Budi Utomo

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.