Panduan Sukses Pembangunan Rumah: Mengapa Anda Harus Menggunakan Analisis Biaya-Manfaat (Cost-Benefit Analysis)

Penelitian

Authors

  • Laurent Damai Yanti Silaban Universitas Negeri Medan
  • Gebatania Pakpahan Universitas Negeri Medan
  • Titian Dhea Fresensia Purba Universitas Negeri Medan
  • Bunga Madu Simanungkali Universitas Negeri Medan
  • Jessica br Simanungkalit Universitas Negeri Medan

DOI:

https://doi.org/10.31004/jerkin.v4i2.3896

Keywords:

Cost-Benefit Analysis, Investment Feasibility, NPV, IRR, BCR, Payback Period, Life Cycle Cost, Housing Development.

Abstract

Housing development is a long-term investment that requires careful planning to avoid financial risks and unexpected cost escalation. This study highlights the importance of implementing Cost-Benefit Analysis (CBA) as a comprehensive assessment tool for evaluating the feasibility of residential construction projects. Using a descriptive qualitative approach, data were collected through literature review and documentation, and analyzed using key feasibility indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), Payback Period (PP), and Life Cycle Cost (LCC). The findings show that applying CBA provides a holistic understanding of the economic, social, and environmental benefits associated with the project, while also helping to minimize risks and optimize long-term investment value. Therefore, CBA serves as an essential instrument for ensuring that housing development projects are implemented effectively, efficiently, and sustainably.

References

Bagus, I. G., Wijaya, A., Prijanto, A., Made, N., & Sukendar, C. (2020). Kajian analisis biaya dan manfaat ( cost-benefit analysis ) kawasan agrowisata di Indonesia Study of cost-benefit analysis of agrotourism area in Indonesia. 11(2), 189–201.

Manullang, D. W., Karamoy, H., & Pontoh, W. (2019). Analisis Kelayakan Investasi Aktiva Tetap (Studi Kasus Pada Cincau Jo, Blencho Dan Brownice Unit Kreativitas Mahasiswa Universitas Sam Ratulangi). Jurnal EMBA: Jurnal Riset Ekonomi, Manajemen, Bisnis dan Akuntansi, 7(2). Kota Manado

Putra, I. G. B. A. W., Prijanto, A., Sukendar, N. M. C., & Arisena, G. M. K. (2020). Kajian analisis biaya dan manfaat (cost-benefit analysis) kawasan agrowisata di Indonesia. AGROMIX, 11(2), 189-201.

Wahyudhi, O. et al. (2014) ‘5641-16257-1-Pb’, Jurnal Teknik ITS, pp. 41–46. Available at: https://doi.org/10.12962/j23373539.v3i1.5641.

Indramanik, I. B. G., & Astrawan, I. K. A. (2018). ANALISA BIAYA PELAKSANAAN PEMBANGUNAN PERUMAHAN. 10(2), 77–86.

Maskur, A. (n.d.). Analisis estimasi biaya pembangunan rumah ekonomis dan ramah lingkungan untuk masyarakat berpenghasilan rendah. 75–88.

Ramadhan, W., & Hesna, Y. (2014). ANALISIS BIAYA KEUNTUNGAN DEVELOPER DARI HARGA JUAL BERBAGAI TIPE RUMAH PADA BANGUNAN PERUMAHAN Wahyu Ramadhan 1 dan Yervi Hesna 2 ABSTRAK. 10(2), 25–30.

Sukendar, N. M. C. (2023). Kajian Analisis Biaya dan Manfaat ( Cost-Benefit Analysis ) Sayuran Hidroponik dengan Sistem Nutrient Film Technique di Indonesia. 11(1), 55–61.

Downloads

Published

05-12-2025

How to Cite

Laurent Damai Yanti Silaban, Gebatania Pakpahan, Titian Dhea Fresensia Purba, Bunga Madu Simanungkali, & Jessica br Simanungkalit. (2025). Panduan Sukses Pembangunan Rumah: Mengapa Anda Harus Menggunakan Analisis Biaya-Manfaat (Cost-Benefit Analysis): Penelitian. Jurnal Pengabdian Masyarakat Dan Riset Pendidikan, 4(2), 12134–12138. https://doi.org/10.31004/jerkin.v4i2.3896

Most read articles by the same author(s)